The production plant of the medical industry Radiometer in Stargard – II STAGE
INWESTOR: RSOL Radiometer Solutions Sp. z o.o.
DESIGN: 2018
EXECUTED: 2018/2019
AREA: 17.500 m2
SCOPE:*
- detailed design
- supervision
The second stage of the investment for the Danish investor. The investment included the design of a facility in the medical industry, intended for the production of technologically advanced medical equipment for diagnostic tests, with a very high technological saturation, which included, among others, CleanRooms meeting cleanliness standards and subject to validation. The multi-disciplinary detailed design was made in BIM technology, which allows for the visualization of the course of the installation inside the building in relation to each other and to the building elements.
*concept and building permit design by the BAMS architectural office from Szczecin.